Latest News


Three Full Loads of Two Tier Trusses with Fermacel and Y WALL Non Combustible Board Composite 60 minute Rated Spandrel Panels all delivered 100% On Time In Full for a new Care Home at Preston Marina.

5th September 2022

Three Full Loads of Two Tier Trusses with Fermacel and Y WALL Non Combustible Board Composite 60 minute Rated Spandrel Panels all delivered 100% On Time In Full for a new Care Home at Preston Marina.

Congratulations to Wyckham Blackwell supported driver Michael O’Brien for winning the Classic Formula Junior Trophy at the Silverstone Classic last Weekend in a 1962 Brabham

31st August 2022

Congratulations to Wyckham Blackwell supported driver Michael O’Brien for winning the Classic Formula Junior Trophy at the Silverstone Classic last Weekend in a 1962 Brabham

Another Full Load of Weather Defence Clad Bespoke Spandrel Panels all secured onto Stillages for Safe Unloading ready for delivery this week 100% On Time In Full for a Major Commercial Development in Birmingham.

30th August 2022

Another Full Load of Weather Defence Clad Bespoke Spandrel Panels all secured onto Stillages for Safe Unloading ready for delivery this week 100% On Time In Full for a Major Commercial Development in Birmingham.

Wyckham Blackwell are delighted to have completed the Manufacture and Installation of the Structural Roof Timbers for the Elephant and Castle pub at the Black Country Living Museum ready for the Grand Opening last week – 22/08/22

22nd August 2022

Wyckham Blackwell are delighted to have completed the Manufacture and Installation of the Structural Roof Timbers for the Elephant and Castle pub at the Black Country Living Museum ready for the Grand Opening last week – 22/08/22

Another full load of Easi-Joist Metal Web Joists and 22mm Protect Flooring being delivered 100% On Time In Full for a new housing site in Coventry

15th August 2022

Another full load of Easi-Joist Metal Web Joists and 22mm Protect Flooring being delivered 100% On Time In Full for a new housing site in Coventry

Full load of Top Hat 10m Span Attic Trusses, Half Attics and Box Beam Girder supports all ready for delivery today for a large New Build House in Scunthorpe 100% On Time In Full – 08/08/22

8th August 2022

Full load of Top Hat 10m Span Attic Trusses, Half Attics and Box Beam Girder supports all ready for delivery today for a large New Build House in Scunthorpe 100% On Time In Full – 08/08/22

Another Full Load of Trusses, Easi-Joists and Protect TG4 Flooring for a New Housing Development in Dudley, West Midlands ready for Delivery 100% On Time In Full from Wyckham Blackwell.

25th July 2022

Another Full Load of Trusses, Easi-Joists and Protect TG4 Flooring for a New Housing Development in Dudley, West Midlands ready for Delivery 100% On Time In Full from Wyckham Blackwell.

Major Trussed Roof and Spandrel Panels Design, Manufacture and Install Project in Hockley Mills Birmingham, using Weather Defence Boards all 100% On Track from Wyckham Blackwell.

15th July 2022

Major Trussed Roof and Spandrel Panels Design, Manufacture and Install Project in Hockley Mills Birmingham, using Weather Defence Boards all 100% On Track from Wyckham Blackwell.

Acquisition of the David Smith St Ives & Glulam Timber Engineering Businesses

1st July 2022

Acquisition of the David Smith St Ives & Glulam Timber Engineering Businesses

Supply & Fit of Raised Tie, Dual Pitch Trusses and Integrated Box Beam Flat Roof all 100% On Time and On Schedule for a 82 Bedroom Care Home in Enfield

22nd June 2022

Supply & Fit of Raised Tie, Dual Pitch Trusses and Integrated Box Beam Flat Roof all 100% On Time and On Schedule for a 82 Bedroom Care Home in Enfield

Two Full Loads of Fire Treated Trusses to (IWS-FR+)  Delivered this week 100% On Time In Full for a new Block of 30 Apartments of Affordable Housing in Coventry

10th June 2022

Two Full Loads of Fire Treated Trusses to (IWS-FR+) Delivered this week 100% On Time In Full for a new Block of 30 Apartments of Affordable Housing in Coventry

Two Full Loads of Raised Tie Trusses Delivered 100% On Time In Full for the next Phase of an 82 Bed Care Home Wyckham Blackwell Supply & Fit Roof installation in Enfield

3rd June 2022

Two Full Loads of Raised Tie Trusses Delivered 100% On Time In Full for the next Phase of an 82 Bed Care Home Wyckham Blackwell Supply & Fit Roof installation in Enfield