Latest News


13m Long Span Two-Part Attic Curved Barrel Trusses being manufactured and loaded this week for delivery 100% On Time In Full.

8th November 2024

13m Long Span Two-Part Attic Curved Barrel Trusses being manufactured and loaded this week for delivery 100% On Time In Full.

Wyckham Blackwell and The Keystone Group are delighted to announce their joint acquisition of Wilson Roof Truss Ltd on 25/10/24.

28th October 2024

Wyckham Blackwell and The Keystone Group are delighted to announce their joint acquisition of Wilson Roof Truss Ltd on 25/10/24.

Installation completed in Shipston-on-Stour, including large Attic Trusses with bespoke Gable Panels built to client specification.

9th October 2024

Installation completed in Shipston-on-Stour, including large Attic Trusses with bespoke Gable Panels built to client specification.

Full Load of 4.5m tall, Stub End Fink Trusses all inverted when loaded to allow delivery in one piece.

3rd October 2024

Full Load of 4.5m tall, Stub End Fink Trusses all inverted when loaded to allow delivery in one piece.

Congratulations to Birchall Racing, who have been congratulated as the fourteen-time winners of the Isle of Man sidecar TT with the 2023 Segrave Trophy.

4th September 2024

Congratulations to Birchall Racing, who have been congratulated as the fourteen-time winners of the Isle of Man sidecar TT with the 2023 Segrave Trophy.

11m Span Dual Pitch Flat Top Trusses being installed this week on a new house development in Dorridge.

22nd August 2024

11m Span Dual Pitch Flat Top Trusses being installed this week on a new house development in Dorridge.

12m Span Attic Trusses all delivered 100% On Time In Full this week for a new house project in Walsall.

12th August 2024

12m Span Attic Trusses all delivered 100% On Time In Full this week for a new house project in Walsall.

Full load of Raised Tie Top Hat Trusses delivered 100% On Time In Full for a new care home development in Leatherhead.

5th August 2024

Full load of Raised Tie Top Hat Trusses delivered 100% On Time In Full for a new care home development in Leatherhead.

The Wyckham Blackwell/Timber Innovations Summer 2024 newsletter is now available to read

29th July 2024

The Wyckham Blackwell/Timber Innovations Summer 2024 newsletter is now available to read

The Wyckham Blackwell team joined a local student last week, to provide valuable assistance again in helping the Hampton Conservation Group, to lay logs and chippings to maintain and protect path areas. The area is prone to being muddy and by helping to make these improvements, it encourages people to stay on the designated path.

15th July 2024

The Wyckham Blackwell team joined a local student last week, to provide valuable assistance again in helping the Hampton Conservation Group, to lay logs and chippings to maintain and protect path areas. The area is prone to being muddy and by helping to make these improvements, it encourages people to stay on the designated path.

1200 metres of Metal Web Roof Easi-Joists, 304mm deep, for the first phase of a 130 bed new care home in Stafford, all installed ready for fitting pre-cut Firring strips and Roof Decking.

24th June 2024

1200 metres of Metal Web Roof Easi-Joists, 304mm deep, for the first phase of a 130 bed new care home in Stafford, all installed ready for fitting pre-cut Firring strips and Roof Decking.

Another full load of Longspan Metal Web Easi-Joists delivered this week, 100% On Time In Full, for a Wyckham Blackwell Supply & Fit installation of a flat roof for a new care home in Stafford.

17th June 2024

Another full load of Longspan Metal Web Easi-Joists delivered this week, 100% On Time In Full, for a Wyckham Blackwell Supply & Fit installation of a flat roof for a new care home in Stafford.