Latest News


Two more new shiny bespoke trailers received this week to expand our delivery fleet now being loaded for their first deliveries.

30th May 2023

Two more new shiny bespoke trailers received this week to expand our delivery fleet now being loaded for their first deliveries.

Another Curved Truss Roof being manufactured and delivered this week 100% On Time In Full. This was for a Dutch Barn Conversion in Pebworth and has been designed with a vaulted high ceiling

23rd May 2023

Another Curved Truss Roof being manufactured and delivered this week 100% On Time In Full. This was for a Dutch Barn Conversion in Pebworth and has been designed with a vaulted high ceiling

One of our last deliveries of Trusses and Spandrel Panels on WBT18 this week. The oldest HGV in our Delivery Fleet is soon to be retired when our latest new Volvo arrives in June.

15th May 2023

One of our last deliveries of Trusses and Spandrel Panels on WBT18 this week. The oldest HGV in our Delivery Fleet is soon to be retired when our latest new Volvo arrives in June.

Another Full Load of Roof Trusses and Spandrel Panels loaded ready for delivery into Worcester this week on our HGV Rufus all 100% On Time In Full

9th May 2023

Another Full Load of Roof Trusses and Spandrel Panels loaded ready for delivery into Worcester this week on our HGV Rufus all 100% On Time In Full

Wyckham Blackwell and The Keystone Group are delighted to announce their joint acquisition

4th May 2023

Wyckham Blackwell and The Keystone Group are delighted to announce their joint acquisition

Our Spring newsletter is now available to read!

4th May 2023

Our Spring newsletter is now available to read!

Full load of Primed Timber Porches with detailed Canopy Units all loaded for delivery 100% On Time In Full

2nd May 2023

Full load of Primed Timber Porches with detailed Canopy Units all loaded for delivery 100% On Time In Full

Full Load of Two Tier Trusses for a Three Storey New Apartment Block in Reading with Spandrel Panels and Gable Panels all loaded and pre-slung for crane unload, ready for delivery this week 100% On Time In Full

24th April 2023

Full Load of Two Tier Trusses for a Three Storey New Apartment Block in Reading with Spandrel Panels and Gable Panels all loaded and pre-slung for crane unload, ready for delivery this week 100% On Time In Full

Longspan Attic Trusses with integral Metal Web floor to maximize room width and to assist the installation of M&E all delivered 100% On Time In Full for a major house redevelopment project in Dorridge, Solihull

11th April 2023

Longspan Attic Trusses with integral Metal Web floor to maximize room width and to assist the installation of M&E all delivered 100% On Time In Full for a major house redevelopment project in Dorridge, Solihull

Roof Truss & Metal Web Joist Designer

5th April 2023

Roof Truss & Metal Web Joist Designer

Another full load of 8m span, 417mm deep Easi-Joists being delivered this week

3rd April 2023

Another full load of 8m span, 417mm deep Easi-Joists being delivered this week

Hybrid Easi-Attic Two Tier Trusses with integrated Spandrel Panels and Split Level Ridge Line Designed & Manufactured this week to save installation time on Site

28th March 2023

Hybrid Easi-Attic Two Tier Trusses with integrated Spandrel Panels and Split Level Ridge Line Designed & Manufactured this week to save installation time on Site